![]() |
|||||||||||||||||
|
|||||||||||||||||
![]() |
![]() |
![]() |
|||||||||||||||
|
Drill cuttings containers![]() ![]()
2013 As a participant of the oil-and-gas fields’ development programme on the Arctic shelf, Belfreight has replenished its container base with dedicated off-shore containers. 250 units have been designed, manufactured and certified according to DNV standard and destined for operations at sea in extreme conditions. Drill cuttings disposal: July 2013 – to the present. JSC "Belfreight" has been chosen as a General contractor for drill cuttings disposal during erection of the first three boreholes with the Prirazlomnaya platform. Within the framework of the contract signed with the "Gazprom Burenie" LLC, there own dedicated mud-skip containers are being used.
|
Shipping line Arkhangelsk – Narian-Mar-Varandey![]() Contacts![]() ArchangelPhone: +7-8182-650-900Fax: +7-8182-656-111 office@belfreight.ru MurmanskPhone: +7-8152-45-6181Fax: +7-8152-45-9713 office@belfreight.murmansk.ru Chartering Department Contacts![]() Ph:+7 8182 650-900 add. 110 Mob. +7 921 247 25 02 chartering@belfreight.ru Ship’s operation department Contacts![]() Ph.+7 8182 650-900 add. 110 Mob. +7 921 247 25 02 chartering@belfreight.ru Ph.+7 8182 650-900 add. 112 Mob. +7 921 247 25 00 ship@belfreight.ru Offshore project and towage department contacts![]() Department Head Ph.+7 8182 650-900 add.120 Mob. +7 921 247 25 52 project@belfreight.ru Forwarding Department Contacts![]() Department Head Ph.+7 8182 650-900 add. 125 Mob. +7 921 479 12 21 forwarding@belfreight.ru |
|||||||||||||||
© 2009 Belfreight | About | Fleet | Useful information | Contacts | | Web-site creation - "Vagner" |